    City of Las Vegas & College of Southern Nevada
    Fire Department and Instructional Center
    Las Vegas, NV

     

    Fire Station and Instructional Facility on ±1.65 acres

    Year of Completion: 2010

     

    Services included the following:

    • Drainage Study
    • Grading plans with details and cross-sections
    • Utility Plans
    • Striping, signage and street lighting plans
    • Offsite improvements
      

     

    Northwest Career and Technical Center
    Las Vegas, NV

     
    High School on ±29 acres
    Year of Completion: 2006

    Services included the following:
    • Drainage study, traffic study, hydraulic analysis
    • Grading plans, utility plans
    • Storm drain plan & profiles
    • Striping, signage and street light plans
    • Coordination with the City of Las Vegas Bureau of Land Management (BLM) right-of-way grant
      

     

    St. Andrews Lutheran Church
    Las Vegas, NV

     
    7,000 SF Building Additions
    Year of Completion: 2009

    Services included the following:
    • Drainage study update and hydraulic analysis
    • Grading plans with details and cross-sections
    • Parking lot, landscape and flatwork were updated to be in compliance with ADA access requirements
      

     

    Bright Angel Chruch of Christ
    Las Vegas, NV

     
    New 6,000 SF Building on Church Campus
    Year of Completion: 2005

    Services included the following:
    • Drainage study update
    • Grading plans with details and cross-sections
    • Parking lot was doubled in size to provide additional parking, ADA compliant parking facilities and increase the circulation for the full build-out of the church campus
     

     

    Southern Nevada Correctional Center Wastewater Treatment Plant Pond 1 and 3 Aeration Upgrade
    Las Vegas, NV

     
    Wastewater Treatment Plant (WWTP) on ±58 acres
    Year of Completion: 2010

    Services included the following:
    • Overall site and grading plans
    • Utility plan with cooresponding details
    • Biochemical oxygen demand (BOD) calculations for a prison population of 900 inmates
    • Project management consisting of coordination with the electrial engineer, NV Energy and Clark County Department of Aviation
    • Produced project specifications
    • Revised WWTP operations and maintenance manual

    < Back