Cheyenne Campus Parking Lot Improvements

West Parking Lot Improvements at Cheyenne Campus

North Las Vegas, Nevada

Client:  College of Southern Nevada

Taney Engineering recently completed the Cheyenne Campus West Parking Lot project. This project consisted of correcting drainage issues along the western edge of the existing parking lot by providing a series of drop inlets along the valley gutter. This channels the flow of surface runoff and directs it into a storm drain pipe that connects to the existing storm drain pipe at the southwestern corner of the parking lot.

  • 7 Acres
  • Boundary/Topographic Survey
  • Hydrology Calculations
  • Grading/Traffic/Striping/Horizontal Control Plan
  • Access Routes
  • Curb/Gutter/Signage
  • Corrected Drainage Along Western Edge of Parking Lot
  • Provided Series of Drop Inlets To Direct Flow Into Storm Drain
  • ADA Parking Stalls/Ramps to Sidewalks
  • Construction Staking