CSN Parking Lot and Drainage Improvements

CSN Parking Lot and Drainage Improvements at Charleston Campus

Las Vegas, Nevada

Client:  College of Southern Nevada

The College of Southern Nevada Charleston Campus needed additional parking and to resolve drainage issues with water flow traversing through the entire property. New parking lots were designed and added to the south side of the college campus and a comprehensive storm drain system designed to mitigate flood waters through the college campus. The project was coordinated with a planned City of Las Vegas Fire Station to be located at the intersection of Oakey and Torrey Pines. This project completes the parking lot build out for the campus and alleviates the historical flooding issues. Designed to CCRFCD criteria and processed through City of Las Vegas.

  • 75 Acres
  • New Parking Lot
  • Boundary Survey
  • Easement Map
  • Zone Change
  • Parcel Map
  • Hydrology Study
  • Grading Plan
  • Paving
  • Storm Drain System
  • Custom Manhole Structures and Facilities
  • Signing, Striping, Lighting
  • ADA Compliance
  • Traffic Study
  • Utilities Design and Coordination