Des Lacs Railroad Bridge

Des Lacs, North Dakota

Client:  Phillips and Jordan

Taney Engineering provided both survey and materials testing services for the construction of the BNSF Des Lacs Railroad Bridge in 2014.

  • Horizontal/Vertical Survey Control For Construction of 8, 40 ft high by 60-inch Diameter Concrete Piers; 8, Concrete Filled Steel Piers; and Construction of All Abutments, Beams, and 450 ft Long Bridge Girder Rails
  • Provided Concrete Testing Services For All Concrete Work
  • Participated in All Weekly Safety Meetings